Call Us

Call us Today
(888) 846-4937

SWEPCO Looking to Add 300 MW of Solar Inside Territory

Written by: Leonard Parker | Solar News | 29th June


Southwestern Electric Power Co. (SWEPCO), a subsidiary of American Electric Power (AEP), has issued three requests for proposals for renewable and short-term generating capacity.

The RFPs solicit bids for the purchase of solar resources up to 300 MW, wind resources of up to 3 GW,  and short-term accredited deliverable capacity up to 250 MW.

Wind resources must be a minimum of 100 MW, interconnect to the Southwest Power Pool (SPP) and be located in Arkansas, Louisiana, Texas, Oklahoma, Kansas or Missouri.

Solar resources must be a minimum of 50 MW, interconnect to SWEPCO’s transmission system within SPP and be located in the SWEPCO service territory.

Proposals for short-term capacity must be for a minimum of 50 MW from SPP resources.

Proposals are due by Aug. 12. Response and contact information is available here.



Source: https://solarindustrymag.com/swepco-looking-to-add-300-mw-of-solar-inside-territory